Building the Horizontal Stabilizer was the second biggest job so far. Here I'm building the inside.
Once the frame was completed I had to prep the lower side to mate the frame.
The lower skin and frame is in the jig to dry.
All dry.
Putting on the upper skin.
Monday, July 30, 2007
Building the Horizontal Stabilizer
Posted by Iron Air Wolf at 9:47 PM
Labels: Epic Build
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment