BLOGGER TEMPLATES AND TWITTER BACKGROUNDS

Tuesday, September 23, 2008

Day 26 Project Iron Wolf

July 31 2008
Recieved most of the suspension from D&C Extreem. This set of pictures are the rear suspension all set in place.
This picture is the frame insert all welded up. This ties the rear four link and front three link to the frame.

The forward anchor point for the four link.

The Dana 60 Truss.

Rear anchor point of the four link.

Good shot of the right side. Everything is tacked awaiting the drive train. I need to have the tranny, NP231 Box 4 Rocks doubler kit, and Dana 300 to go in so I can set pinion angle.

0 comments: