Scarecrow Trail

Saturday the 18th of August Sharon and I went out on the Scarecrow Trail. The trail is a 25 mile loop that hugs the Utah / Nevada boarder. It was an easy trail. The trail started at an elevation of 3350 ft and climbed to 5630 ft. Check out her new ITP SS112 rims and Mudlite tires. Looks pretty good.



The trail went through a large Joshua tree forest. This part of the forest was burnt out by the 2005 /2006 fires.



This is the Joshua tree forest that did not get touched by the fire. The forest looked like it covered about 20 acres.


Taking a rest under the Joshua tree.


Inside the Joshua tree forest.


Sharon dropping 2 feet into a wash and climbing back out. Pretty good for her second trip on an ATV.

It's time for lunch.

25 miles, 3 hours and its time to head home.

Tuesday, August 7, 2007

Dallas Maintance Trip Day 3


Honey I don't think were in Utah any more. Mooooooo!



No nose.


Working on the Pratt and Whitney PT6/66.


BJ's new plane. They are going to repaint it and make it white again. The black is way to hot.




A night game at the Texas Ranger ball field. The game started at 7:35pm


Texas Rangers VS Oakland A's



Our tickets to the Rangers game.


Sharon and I at our seats. Section 35 Row 17 Seat 5, 6



My ball park beer and peanuts. Looks like I need another, this one came a 1/4 full. Someone needs to clean up this peanut shell mess. Looks like I grew up in a barn.




The first pitch of the night. The final score was 8 to 7, Rangers win.

Monday, August 6, 2007

Dallas Maintance Trip Day 2

After shopping at the Bass Pro shop, we found this winery in the old town of Grapevine Texas.


Met some people from Savannah Georgia taste testing the wine. Cheers!


Good old Texas barbecue.


The inside of Colters. Are you ready to eat?

Dallas Maintance Trip

Our flight path to Denton Texas on the 5th 0f August.

Sharon with me at 39,000 feet heading to Dallas Texas

Landing at KDTO "Denton airport" runway 17

The plane sitting in Jetworks hanger


Jetworks hanger






Tuesday, July 31, 2007

Putting everything togeather


The Hull and Wing is now mated. Its time to put everything togeather and see how it fits.








Putting the very large flap in place.









Setting the aileron in place. Getting all three hinges aligned was a lot of fun. Ha. Ha.








Flap and aileron in place and gap is really good. the closer the gap the better the wind flow over the whole wing.







A good look of the flap in the retracted position. Gap is good.

Monday, July 30, 2007

Building the Elevator


This was a fun step. I had to melt lead and pour it into a mold. This is a counter weight for the elevator.








Once the Horizontal Stabilizer was dry I had to cut off the elevator, attach the torque tube, and hinges.








Working on the bulk head for the elevator.









Attaching the hinge.








Finishing up. All is done and its time to put it all together and check the fit. If all fits good its time for paint.

Building the Horizontal Stabilizer


Building the Horizontal Stabilizer was the second biggest job so far. Here I'm building the inside.








Once the frame was completed I had to prep the lower side to mate the frame.








The lower skin and frame is in the jig to dry.









All dry.








Putting on the upper skin.

Building the Rudder


Again, playing with Hysol. Interior is done.









Top is going on.









Rig is in place ready for drying.








All dry and electrical cables in place for position light and camera.

Building Flaps


Installing all the ribs inside the flaps.








All ribs installed on port and starboard flaps. Ready for the top.








Installing the tops.








Placing the in the jig for drying.







Flaps are dry, ready to put on wing, check alignment, and go to paint.