BLOGGER TEMPLATES AND TWITTER BACKGROUNDS �

Monday, July 30, 2007

Building the Horizontal Stabilizer


Building the Horizontal Stabilizer was the second biggest job so far. Here I'm building the inside.








Once the frame was completed I had to prep the lower side to mate the frame.








The lower skin and frame is in the jig to dry.









All dry.








Putting on the upper skin.

0 comments: