BLOGGER TEMPLATES AND TWITTER BACKGROUNDS

Wednesday, October 7, 2009

Day 45 Project Iron Wolf

09 September 2009
Putting on the rock slidders on. The plan is to add a slug in the rock slidder tubes and have the slug go through the frame. This should put added strength to the rock slidder.


Measured and drilled to start the cutting process.
Using plazma cutter to get the job done. Cutts like butter.

All cut.

Pulling slug out. This thing is still about 200 deg.


In place and ready for final welding.



0 comments: