BLOGGER TEMPLATES AND TWITTER BACKGROUNDS

Saturday, July 18, 2009

Day 40 Project Iron Wolf

15 July 2009
Setting up Dana 300 shift levers.


Used plazma cutter to notch trans tunnel to allow shifting of Dana 300. Right stick is for FWD axle and Left is for Rear.


Dana 300 twin stick installed. Boot in place. Trans tunnel cover installed. The oval hole in upper right on cover needs to be covered up with a patch. That hole was for the Dana 20.


View of Dana 300 Twin stick from underneath.

Distance view.

0 comments: