Made a stop in Aspen Co. prior to making the trip to Nashville TN. This was pre-season and the place was pretty dead.
Monday, February 2, 2009
A Morning in Aspen
Made a stop in Aspen Co. prior to making the trip to Nashville TN. This was pre-season and the place was pretty dead.
Posted by Iron Air Wolf at 10:08 AM 0 comments
Labels: Business Trips
A Morning in Chicago
A Monday morning in Chicago Ill. The Windy city.
Posted by Iron Air Wolf at 9:56 AM 0 comments
Labels: Business Trips
Wednesday, October 8, 2008
Cabo Trip Pt. 3
Cabo Poluma. Went diving in the Sea of Cortez. Very cool dive.
Posted by Iron Air Wolf at 2:15 PM 1 comments
Labels: Business Trips, Personal Trips, Vacation
Cabo Trip Pt. 2
The pool has a sit in bar. Might be dangerous. :)
Posted by Iron Air Wolf at 1:57 PM 0 comments
Labels: Personal Trips, Vacation
Cabo Trip Pt. 1
Proline 21 showing track from over Mexico to Cabo Via the Sea of Cortez.
Leaving the main land of Mexico and heading over the Sea of Cortez.
Posted by Iron Air Wolf at 1:42 PM 0 comments
Labels: Personal Trips, Vacation
Day 29 Project Iron Wolf
727 Torque flight Transmission.
The NP 231 transfer case Box 4 Rocks doubler kit.
Posted by Iron Air Wolf at 1:14 PM 0 comments
Labels: 1972 Scout II
Day 28 Project Iron Wolf
Posted by Iron Air Wolf at 12:53 PM 0 comments
Labels: 1972 Scout II
Tuesday, September 23, 2008
Day 27 Project Iron Wolf
In this picture you can see the garage door is very close to the windshield hoop. 4" of clearance.
Set in place. In this picture you can see the new body bushing and the 3" body lift.
Right side view.
Another view. 39.5" Irok and Hummer set in place. In this picture you can see some of the suspension with the coil in place on left side. The height of the Scout should drop about 2". Still pretty tall.
Posted by Iron Air Wolf at 11:57 AM 0 comments
Labels: 1972 Scout II
Day 26 Project Iron Wolf
The Dana 60 Truss.
Rear anchor point of the four link.
Good shot of the right side. Everything is tacked awaiting the drive train. I need to have the tranny, NP231 Box 4 Rocks doubler kit, and Dana 300 to go in so I can set pinion angle.
Posted by Iron Air Wolf at 11:32 AM 0 comments
Labels: 1972 Scout II
Day 25 Project Iron Wolf
New breaks and 3" spacer to help with back spacing of thoes hummer rims.
Another view of break set up.
Posted by Iron Air Wolf at 11:14 AM 0 comments
Tuesday, April 22, 2008
Day 23 Project Iron Wolf
I have two of the panels about 60 % done. I'm glad to report that there is only about an 1/8" of bondo at the thickest.
Hood. The black paint that was sprayed on to protect the body did a great job. The bad thing is this stuff is a pain to get off. I think they sprayed a rubberized undercoating on the whole truck.
A little more and the hood will be ready for the glaze.
Had to put this picture in. It is a humming bird in her nest. She is in the tree next to our house and looks down at me working. Very cool.Posted by Iron Air Wolf at 9:09 PM 0 comments
Labels: 1972 Scout II














